top of page
Port Warehouse Renovation 

Value: 1.5 Million

Area: 2,630 m2

2022-2023

TM-removebg-preview_edited.png

Complete Renovation of 4 warehouses located in Dammam Port Bonded Zone. The scope of work includes

  • Demolition of flooring, Repair, supply and apply Epoxy with screed.

  • Supply and installation of cold room panels, doors, refrigeration units, lightings, electrical panel board for new Chiller and Freezer storage Facility

  • Construction of New Office room, Breakroom and WC facilities with complete MEP works and IT.​

  • Warehouse Floor signages and supply, Installation of Pallet racking system

  • Installation of scissor lift & packing equipment, supply and Installation of Steel structure for Mezzanine floor with epoxy flooring.

Tamimi Express Store in SparK Square

2023

TM-removebg-preview_edited.png

Value:  0.95 Million

Area: 450m2

Complete Fit out Contract for Express Store and Coffee shop

The scope of work includes

  • Demolition of Existing Facility and disposal of debris to designated area.

  • Construction of Block wall, Gypsum wall partition, ceiling, painting.

  • Supply and installation of Automatic sliding doors, Shutter door.

  • Installation of Gondolas, Commercial Refrigeration chillers and Pallet racks

  • Complete supply and installation of MEP works includes lightings, ducted HVAC and Fire fighting system

  • Supply and installation of Wooden Counters for coffee shop

  • Supply and apply Epoxy flooring.

Tamimi Express Store in Rivera Compound

2022

TM-removebg-preview_edited.png

Value: 0.40 Million

Area: 225 m2

Complete Fit out Contract for Express Store

The scope of work includes

  • Demolition of Existing Facility and disposal of debris to designated area.

  • Construction of Block wall, Gypsum wall partition, ceiling, painting.

  • Supply and installation of Automatic sliding doors.

  • Installation of Gondolas, Commercial Refrigeration chillers and Pallet racks

  • Complete supply and installation of MEP works includes lightings, ducted HVAC and Fire fighting system

Tamimi Express Store in Adjan Walk 

2022

TM-removebg-preview_edited.png

Complete Fit out Contract for Express Store

The scope of work includes

  • Demolition of Existing Facility and disposal of debris to designated area.

  • Construction of Block wall, Gypsum wall partition, ceiling, painting.

  • Supply and installation of Automatic sliding doors.

  • Installation of Gondolas, Commercial Refrigeration chillers and Pallet racks

  • Complete supply and installation of MEP works includes lightings, ducted HVAC and Fire fighting system

Value:  0.32 Million

Area: 142 m2

This Page is Under Construction, More to come